professional supplier of
construction machinery equipment

VY1200A static pile driver

Short Description:

VY1200A static pile driver is a new type of foundation construction machinery which adopts full hydraulic static pile driver. It avoids the vibration and noise caused by the impact of the pile hammer and the air pollution caused by the gas emitted during the operation of the machine. The construction has little impact on the nearby buildings and residents’ life.

Working principle: the weight of the pile driver is used as the reaction force to overcome the friction resistance of the pile side and the reaction force of the pile tip when pressing the pile, so as to press the pile into the soil.

According to the market demand, sinovo can provide 600 ~ 12000kn pile driver for customers to choose, which can adapt to different shapes of precast piles, such as square pile, round pile, H-steel pile, etc.


Product Detail

Product Tags

Main Technical Parameter

Model Parameter

VY1200A

Max. piling pressure(tf)

1200

Max. piling
speed(m/min)
Max

7.54

Min

0.56

Piling stroke(m)

1.7

Move stroke(m) Longitudinal Pace

3.6

Horizontal Pace

0.7

Slewing angle(°)

8

Rise stroke(mm)

1100

Pile type (mm) Square pile

F400-F700

Round pile

Ф400-Ф800

Min. Side Pile Distance(mm)

1700

Min. Corner Pile Distance(mm)

1950

Crane Max. hoist weight(t)

30

Max. pile length(m)

16

Power(kW) Main engine

135

Crane engine

45

Overall
dimension(mm)
Work length

16000

Work width

9430

Transportation height

3390

Total weight(t)

120

 Main features

1. Civilized construction
>>Low noise, no pollution, clean site, low labor intensity.

2. Energy saving
>> VY1200A static pile driver adopt low loss constant power variable hydraulic system design, which can greatly reduce energy consumption and improve efficiency.

3. High efficiency
>> VY1200A static pile driver adopt the design of hydraulic system with high power and large flow, in addition, adopt the multi-level control of pile pressing speed and the pile pressing mechanism with short auxiliary time. These technologies give full play to the working efficiency of the whole machine. Each shift (8 hours) can reach hundreds of meters or even more than 1000 meters.

4. High reliability
>>The excellent design of the 1200tf round and H-Steel pile static pile driver, as well as the selection of high reliability purchased parts, make this series of products meet the quality requirements of high reliability that construction machinery should have. For example, the inverted design of the outrigger oil cylinder completely solves the problem that the outrigger oil cylinder of the traditional pile driver is easily damaged.
>>The pile clamping mechanism adopts 16 cylinder pile clamping box design with multi-point clamping, which ensures the protection of pipe pile during pile clamping and has good pile forming quality

5. Convenient disassembly, transportation and maintenance
>> VY1200A static pile driver through the continuous improvement of design, more than ten years of gradual improvement, each part has fully considered its disassembly, transportation, maintenance convenience.

1.Packaging & Shipping 2.Successful Overseas Projects 3.About Sinovogroup 4.Factory Tour 5.SINOVO on Exihibition and our team 6.Certificats

FAQ

Q1: Are you a manufacturer, trading company or a third party?

A1: We are a manufacturer. Our factory is located in Hebei Province near the capital Beijing, 100km away from Tianjin port. We also have our own trading company.

Q2: Wonder if you accept small orders?

A2: Do not worry. Feel free to contact us. In order to get more orders and give our clients more convenience, we accept small orders.

Q3: Can you send products to my country?

A3: Sure, we can. If you do not have your own ship forwarder, we can help you.

Q4: Can you do OEM for me?

A4: We accept all OEM orders, just contact us and give me your design. We will offer you a reasonable price and make samples for you ASAP.

Q5: What's your payment terms?

A5: By T/T, L/C AT SIGHT, 30% deposit in advance, balance 70% before shipment.

Q6: How can I place the order?

A6: First sign the PI, pay deposit, then we will arrange the production. After finished production you need to pay the balance. Finally we will ship the goods.

Q7: When can I get the quotation?

A7: We usually quote you within 24 hours after we get your inquiry. If you are very urgent to get the quotation, please call us or tell us in your mail, so that we could regard your inquiry priority.

Q8: Is your price competitive?

A8: Only good quality product we supply. Surely we will give you the best factory price based on superior product and service.


  • Previous:
  • Next: