OEM China Electric Concrete Breaker Hire Near Me - SPF400B Hydraulic Pile Breaker – Sinovo Detail:
Video
SPF400B Hydraulic Pile Breaker
Specification
Model | SPF400B |
Range of Pile diameter (mm) | 300-400 |
Maximum Drill rod pressure | 325kN |
Maximum stroke of hydraulic cylinder | 150mm |
Maximum pressure of hydraulic cylinder | 34.3MPa |
Maximum flow of single cylinder | 25L/min |
Cut the number of pile/8h | 160 |
Height for cutting pile each time | ≦300mm |
Supporting the digging machine Tonnage(excavator) | ≧7t |
Work status dimensions | 1600X1600X2000mm |
Total pile breaker weight | 650kgs |
SPF400-B Construction’s Parameters
Length of drill rod | Pile Diameter (mm) | Remark |
170 | 300-400 | Standard Configuration |
206 | 200-300 | Optional Configuration |
Product Description
The leading hydraulic pile breaker with five patented technologies and adjustable chain, it is the most efficient equipment to break the foundation plies.
Feature
The hydraulic pile breaker has the following features: easy operation, high efficiency, low cost, less noise, more safety and stability. It imposes no impact force on the parent body of the pile and no influence on the bearing capacity of the pile and no influence on the bearing capacity of the pile, and shortens the construction period greatly. It is applicable for pile-group works and is recommended strongly by the construction department and the supervision department.
1.Environment-friendly: Its full hydraulic drive causes little noises during operation and no influence on the surrounding environments.
2.Low-cost : The operating system is easy and convenient. Fewer operating workers are required to save cost for labor and machines maintenance during construction.
3. Small volume: It’s light for convenient transportation.
4.Safety: Contact-free operation is enabled and it can be applied for construction on complex land form.
5.Universal property: It can be driven by diverse power sources and is compatible with excavators or hydraulic system according to the construction sites conditions. It is flexible to connect multiple construction machines with universal and economical performance. The telescopic sling lifting chains meet the requirements of various land forms.
6.Long service life: It is made of military material by first-class suppliers with reliable quality, extending its service life.
Operation steps
1. According to pile diameter, with reference to the construction reference parameters corresponding to the number of modules, directly connect the breakers to the work platform with a quick change connector;
2. The working platform can be excavator, lifting device and hydraulic pump station combination, the lifting device can be truck crane, crawler cranes, etc;
3. Move the pile breaker to the working pile head section;
4. Adjust the pile breaker to the suitable height (please refer to construction parameter list when crushing the pile, otherwise the chain may be broken), and clamp the pile position to be cut;
5. Adjust the excavator’s system pressure according to the concrete strength, and pressurize the cylinder until the concrete pile breaks under high pressure;
6. After the pile is crushed, hoist the concrete block;
7. Move the crushed pile to the designated position.
Product detail pictures:


Related Product Guide:
With our leading technology as well as our spirit of innovation,mutual cooperation, benefits and development, we will build a prosperous future together with your esteemed company for OEM China Electric Concrete Breaker Hire Near Me - SPF400B Hydraulic Pile Breaker – Sinovo, The product will supply to all over the world, such as: Naples, South Korea, Melbourne, Our company has already have pass the ISO standard and we're fully respect our customer 's patents and copyrights. If the customer provides their own designs, We will guarantee that they will likely be the only one can have that merchandise. We hoping that with our good products can bring our customers a great fortune.

This is the first business after our company establish, products and services are very satisfying, we have a good start, we hope to cooperate continuous in the future!
