1. Swing Angle of automatic spraying device: can be set arbitrarily.
2. The lower holder is a floating four-kick, which has uniform clamping force and does not damage the drill pipe.
3. Suitable for construction under bridge and in tunnel, and convenient to move the machine to the hole.
4. Hydraulic leg step performance: 4-point hydraulic leg support.
5. Visual interface, which can adjust the attitude according to the construction parameters and set the rotary/raising speed of the power head in real time.
6. Equipped with a 3-ton crane arm, which can effectively reduce labor intensity.
| Parameters and names |
Multi-tube horizontal rotary drilling rig SGZ-150S |
| Spindle bore |
150 mm |
| Main shaft speed |
High speed 0~48 rpm and low speed 0~24 rpm |
| Main shaft torque |
High speed 6000 N ·m low speed 12000 N ·m |
| Feed travel |
1000 mm |
| Feed rate |
0~2 m/min when rising and 0~4 m/min when falling |
| The center of the power head is high |
1850 mm (above ground level) |
| Maximum feed force of the power head |
50 kN |
| Maximum lifting force of the power head |
100 kN |
| Power of motor |
45 kW+11kW |
| Maximum lifting weight of the boom |
3.2 T |
| Maximum boom extension |
7.5 m |
| Cantilever rotation Angle |
360° |
| Outline dimension |
4800*2200*3050 mm (including boom) |
| Overall weight |
9 T |
Q1: Are you a manufacturer, trading company or a third party?
A1: We are a manufacturer. Our factory is located in Hebei Province near the capital Beijing, 100km away from Tianjin port. We also have our own trading company.
Q2: Wonder if you accept small orders?
A2: Do not worry. Feel free to contact us. In order to get more orders and give our clients more convenience, we accept small orders.
Q3: Can you send products to my country?
A3: Sure, we can. If you do not have your own ship forwarder, we can help you.
Q4: Can you do OEM for me?
A4: We accept all OEM orders, just contact us and give me your design. We will offer you a reasonable price and make samples for you ASAP.
Q5: What's your payment terms?
A5: By T/T, L/C AT SIGHT, 30% deposit in advance, balance 70% before shipment.
Q6: How can I place the order?
A6: First sign the PI, pay deposit, then we will arrange the production. After finished production you need to pay the balance. Finally we will ship the goods.
Q7: When can I get the quotation?
A7: We usually quote you within 24 hours after we get your inquiry. If you are very urgent to get the quotation, please call us or tell us in your mail, so that we could regard your inquiry priority.
Q8: Is your price competitive?
A8: Only good quality product we supply. Surely we will give you the best factory price based on superior product and service.

















