Factory directly supply Hoist Hook - CQUY55 Hydraulic Crawler Crane – Sinovo Detail:
Technical Parameters
|
Item |
Unit |
Data |
||
| Max. rated lifting capacity |
t |
55@3.5m |
||
| Boom length |
m |
13-52 |
||
| Fixed jib length |
m |
9.15-15.25 |
||
| Boom+fixed jib max. length |
m |
43+15.25 |
||
| Boom derricking angle |
° |
30-80 |
||
| Hook blocks |
t |
55/15/6 |
||
|
Working |
Rope |
Main winch hoist, lower (rope dia. Φ20mm) |
m/min |
110 |
| Aux. winch hoist, lower (rope dia. Φ20mm) |
m/min |
110 |
||
| Boom hoist, lower (rope dia. Φ16mm) |
m/min |
60 |
||
| Slewing Speed |
r/min |
3.1 |
||
| Travel Speed |
km/h |
1.33 |
||
| Reevings |
|
9 |
||
| Single line pull |
t |
6.1 |
||
| Gradeablity |
% |
30 |
||
| Engine |
KW/rpm |
142/2000(imported) |
||
| Slewing radius |
mm |
4230 |
||
| Transport dimension |
mm |
7400*3300*3170 |
||
| Crane mass (with basic boom &55t hook) |
t |
50 |
||
| Ground bearing pressure |
MPa |
0.07 |
||
| Counter weight |
t |
16+2 |
||
Features

1. The main boom main chord adopts high-strength thin-arm steel pipe, which is light in weight and greatly improves the lifting performance;
2. Complete safety devices, more compact and compact structure, suitable for complex construction environment;
3. The unique gravity lowering function can save fuel consumption and improves work efficiency;
4. With rotary floating function, it can achieve high-altitude accurate positioning, and the operation is more stable and safe;
5. The fragile and consumable structural parts of the whole machine are self-made parts, which are unique structural design, convenient maintenance and low cost
Q1: Are you a manufacturer, trading company or a third party?
A1: We are a manufacturer. Our factory is located in Hebei Province near the capital Beijing, 100km away from Tianjin port. We also have our own trading company.
Q2: Wonder if you accept small orders?
A2: Do not worry. Feel free to contact us. In order to get more orders and give our clients more convenience, we accept small orders.
Q3: Can you send products to my country?
A3: Sure, we can. If you do not have your own ship forwarder, we can help you.
Q4: Can you do OEM for me?
A4: We accept all OEM orders, just contact us and give me your design. We will offer you a reasonable price and make samples for you ASAP.
Q5: What's your payment terms?
A5: By T/T, L/C AT SIGHT, 30% deposit in advance, balance 70% before shipment.
Q6: How can I place the order?
A6: First sign the PI, pay deposit, then we will arrange the production. After finished production you need to pay the balance. Finally we will ship the goods.
Q7: When can I get the quotation?
A7: We usually quote you within 24 hours after we get your inquiry. If you are very urgent to get the quotation, please call us or tell us in your mail, so that we could regard your inquiry priority.
Q8: Is your price competitive?
A8: Only good quality product we supply. Surely we will give you the best factory price based on superior product and service.
Product detail pictures:


Related Product Guide:
That has a sound business credit history, outstanding after-sales service and modern producing facilities, we have earned an superb popularity amid our buyers across the planet for Factory directly supply Hoist Hook - CQUY55 Hydraulic Crawler Crane – Sinovo, The product will supply to all over the world, such as: Norwegian, Jamaica, Sierra Leone, We have the best products and professional sales and technical team.With the development of our company, we are able to provide customers best products, good technical support, perfect after-sales service.
The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
-
Massive Selection for Wet Core Drill Bits - SH...
-
Discount wholesale Borehole Heat Pump - SNR600...
-
Good quality 1 Hp Mud Pump Price - Horizontal ...
-
Factory Supply Contiguous Pile Wall - Casing R...
-
Wholesale Price Residential Borehole Drilling -...
-
Free sample for Under Reamed Piles Are Normally...





