What inspection work should be done before using the water well drilling rig?

What inspection work should be done before using the water well drilling rig?

SNR300 water well drilling rig

1. Check whether the oil quantity of each oil tank is sufficient and the oil quality is normal, and check whether the gear oil quantity of each reducer is sufficient and the oil quality is normal; Check for oil leakage.

2. Check whether the main and auxiliary steel wire ropes are broken and whether their connections are intact and safe.

3. Check whether the lifter rotates flexibly and whether the internal butter is polluted.

4. Check the steel structure for cracks, corrosion, desoldering and other damage.

The above is the preparation work to be done before using the water well drilling rig, which can avoid unnecessary accidents as far as possible.